matlab各种分布计算公式,SPC常见项目的计算公式

SPC即统计过程控制(Statistical Process Control)。SPC主要是指应用编译分析技术对生产过程进行实时监控,科学的区分出生产过程中产品质量的随机波动与异常波动,从而对生产过程的异常趋势提出预警,以便生产管理人员及时采取措施,消除异常,恢复过程的稳定,从而达到提高和控制质量的目的。

在测量设备的软件中,经常客户的品质部门会要求设备增加SPC的相关监控工具。

计算公式举例:

过程均值 X=(X1+X2+……+Xn)/n

=(6.84+6.86+……+6.92)/25

=6.8784

平均极差 R=(R1+R2+……+Rn)/n

=(0.3*6+0.2*17+0.1*2)/25

=0.216

Uclx = X+A2R = 6.8784+0.58*0.216 = 7.0037

Lclx = X-A2R = 6.8784-0.58*0.216 = 6.7531

Uclr = D4R = 2.11*0.216 = 0.4558

Lclr = D3R = 0*0.216 = 0

式中A2,D3,D4为常系数,决定于子组样本容量。

1其系数值见下表 :

(2)计算CPK各类项目的值

1.651.811.651.751.71.711.491.651.651.6

1.541.641.521.431.651.721.561.651.551.55

1.621.511.71.621.351.751.631.751.451.65

1.321.711.631.751.621.341.811.681.671.64

1.611.621.781.621.651.621.651.691.631.62

1.551.751.651.631.451.611.661.651.611.76

1.621.581.321.571.561.651.651.751.751.85

1.51.561.621.621.621.581.621.711.331.62

1.61.621.611.851.621.81.431.351.251.64

1.651.61.441.621.681.671.531.81.591.68

X否1.5661.641.5921.6461.591.6451.6031.6681.5481.661

R0.330.30.460.420.350.460.380.450.50.3

(4)画正态分布图

bf16b98c11532747e6813bd89ebc9a8d.png

附上Excel的源文件:

另外,netMarketing类库已经包含上面各类项目的计算函数,有空勇哥会写个说明。

———————

相关资源:斯维尔软件

声明:本站部分文章及图片源自用户投稿,如本站任何资料有侵权请您尽早请联系jinwei@zod.com.cn进行处理,非常感谢!

上一篇 2021年2月16日
下一篇 2021年2月16日

相关推荐